Crunchtime Impact

Crunchtime Impact

APK
0.0‪1K+
2.0.0(710) per Crunchtime Information Systems, Inc.
Jul 19, 2023Ultima versione

Più informazioni

  • Lingua
    English 68
  • È necessario Android
    Android 4.3+ (Jelly Bean MR2, API 18)
  • Classificazione dei contenuti
    Everyone
  • Architettura
    armeabi-v7a
  • Autorizzazioni
  • Firma
    b53a8a76697c7e03c4360e5417284ce764adb9d3

Novità nell'ultima versione 2.0.0(710)

Jun 21, 2016

Added Date Picker and Left / Right arrows to home screen. (Net-Chef 05.20.xx.xx or higher)
Added Hierarchy Level Metrics (Net-Chef 05.20.xx.xx or higher)
Added the ability to add all metrics available in Today's Operating Metrics Widget in Net-Chef.
Drag & drop to re-order metrics
FIX- Improved time in application to match device time.
FIX- Fixed crashing on long press in Drill Down Menu.
FIX- Improved loading of Location / Time Slot data on Drill Down screens.

Mostra Altro
Download in corso

Crunchtime Impact Download APK 2.0.0(710) (49.5 MB)

Se il download non parte, premi qui
Come installare file XAPK / APK
Get the latest updates and news!Subscribe
Come installare file XAPK / APK

All Variants

armeabi-v7a
APK Crunchtime Impact
2.0.0(710)(4332)APK
Jun 21, 201649.5 MBAndroid 4.3+
Scarica
Mostra Altro
tracking
Iscriviti ad APKPure
Sii il primo ad accedere alla versione anticipata, alle notizie e alle guide dei migliori giochi e app Android.
No grazie
Iscrizione
Successo!
Ora sei iscritto alla nostra newsletter.
Ricerca...
Iscriviti ad APKPure
Sii il primo ad accedere alla versione anticipata, alle notizie e alle guide dei migliori giochi e app Android.
No grazie
Iscrizione
Abbonato con successo!
Ora sei iscritto ad APKPure.